top of page
Search

ZeroLandFilling Project Follow-up Meeting

On the 21st of January of 2025, a meeting was held with representation from all the ZeroLandFilling project consortium partners to adress the updates and progress of the project to date.


The meeting was held in the facilities of the Environmental Recycling Complex (CMR) ‘La Campiña’, located in the Madrid municipality of Loeches, where representatives of each member of the consortium intervened to adress details regarding the various work packages of the project.

This meeting reviews the roadmap of the project, which continues to progress, and updates the progress of the different actions and the fulfilment of the objectives.

Technical issues were discussed, concerning facilities, equipment, processes, preliminary results, administrative issues and replicability and dissemination actions.


After the theoretical session and the different interventions, a visit was made to the waste treatment plant and the location where the pyrolysis reactors are planned to be installed. And to end the day, a visit was also made to the facilities, in Guadalajara, of Neoliquid, in charge of the development and testing of the different equipment used in the development of the project.


 
 
 

Comments


Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or CINEA. Neither the European Union nor the granting authority can be held responsible for them.

©2023 por ZeroLandFilling

bottom of page